Sample questions with answers
A few questions of the kind you will get in this test. Try them, then open the answer.
🏗️ Civil Engineering
Q1. Plastering is measured in —
- A.Quintals
- B.Cubic metres (m³)
- C.Square metres (m²)
- D.Running metres (m)
Show answer & explanation
Answer: C. Square metres (m²)
Plastering, painting and flooring are surface works, so they are measured by area in m². 🧠 Volume (m³): earthwork, concrete, brickwork; area (m²): plaster, paint, flooring; weight: steel.
🏗️ Civil Engineering
Q2. As per IS 1200, no deduction is made in brickwork for openings of area up to —
- A.1.0 m²
- B.0.5 m²
- C.0.1 m²
- D.2.0 m²
Show answer & explanation
Answer: C. 0.1 m²
Small openings up to 0.1 m² are not deducted from brickwork; larger openings are deducted. 🧠 Extra labour around small openings balances the material saved.
🏗️ Civil Engineering
Q3. The provision for contingencies in an estimate is usually —
- A.20% of the estimated cost
- B.Less than 1% of the estimated cost
- C.3% to 5% of the estimated cost
- D.10% to 15% of the estimated cost
Show answer & explanation
Answer: C. 3% to 5% of the estimated cost
About 3–5% of the estimated cost is added for contingencies: small unforeseen items of work. 🧠 Work-charged establishment is a separate provision of about 1.5–2%.
🏗️ Civil Engineering
Q4. A sinking fund is created to —
- A.Meet the cost of daily repairs
- B.Pay the property tax
- C.Replace a building or asset at the end of its useful life
- D.Pay the monthly salaries of staff
Show answer & explanation
Answer: C. Replace a building or asset at the end of its useful life
A sinking fund is a fixed amount set aside every year so that enough money is available to replace the asset when its life is over. 🧠 It is part of valuation; it is linked to depreciation of the building.
🏗️ Civil Engineering
Q5. Approximately how many bags of cement are needed for 1 m³ of 1:2:4 concrete?
- A.About 10.4 bags
- B.About 8.4 bags
- C.About 4.4 bags
- D.About 6.4 bags
Show answer & explanation
Answer: D. About 6.4 bags
Dry volume ≈ 1.54 m³. Cement = 1.54 × 1/7 = 0.22 m³. One bag = 0.0347 m³, so 0.22 ÷ 0.0347 ≈ 6.3–6.4 bags. 🧠 Dry volume factor 1.52–1.57 for concrete; one 50 kg bag = 0.0347 m³.
How the test works
- Click Start the test, enter your name if you like, and the timer starts. No login is needed.
- Switch between Hindi and English at any time with the EN / हिं button.
- Each correct answer gives +4 marks and each wrong answer −1, like the real exam. Skipped questions give 0.
- At the end you get your score, accuracy, estimated percentile, subject-wise performance and an explanation for every question.
- Download a free PDF report to revise later.
More free tests
Mock Test
25 questions · 15 minutes
Full-Length Test
100 questions · 60 minutes
Rapid Fire Quiz
10 questions · 1 minute
SSC JE Civil Quick Test
25 questions · 15 minutes
SSC JE Civil Mock Test
50 questions · 30 minutes
SSC JE Civil – Building Materials
8 questions · 8 minutes
SSC JE Civil – Surveying
8 questions · 8 minutes
SSC JE Civil – Soil Mechanics
8 questions · 8 minutes